Why is it required to involve OUC when installing a photovoltaic system?
OUC needs to be aware a solar photovoltaic system will be interconnected to our grid for the safety of our crews working in the area and to manage the impact of solar projects on our grid. Additionally, OUC will verify that the metering equipment is capable of supporting a photovoltaic system.